"Azerbaijan Investment Company" OJSC (AIC) announces a tender for the selection of potential investors to invest in a project (Project) for the restoration and operation of mini hydroelectric power plants (KSES) located in Kalbajar and Lachin regions.
The purpose of the project is to restore (reconstruct) the mini hydroelectric power plants listed in Appendix 1, which is part of this announcement, on the basis of the principle of private-public partnership, to organize their operation, as well as to sell the generated energy to the state-owned network. This is why, a potential investor-partner who will participate in the project should have experience and necessary financial and technical capabilities in the relevant field.
Bidders must submit the following documents to participate in the competition:
Investors interested in participating in the bid can submit the mentioned documents to the address of Azerbaijan Investment Company OJSC until December 16, 2022, at 5:00 p.m.
Address:
AZ 1025, Baku city, ave. 8 Noyabr 25E,
Baku White City Office Building, 3rd floor,
Tel: +994 12 488 80 10
Documents submitted later than the indicated time will be returned unopened.
APPENDIX 1.
Hydroelectric power plants available in liberated areas
№ |
Description |
Rivers |
Probable power , MVt |
Annual electricity production mln, KVt/saat |
Area under construction m 2 |
Water surface level Low canal pound Upper canal pound |
Pressure Stati c |
Pressure
Counted |
Counted consumption m3/ sec |
Status |
Coordinates |
Kalbajar region |
|||||||||||
1 |
Tartar 1 |
Tartarchay |
2.4 |
6,8 |
350 |
2154 2343 |
189 |
166 |
1,71 |
Part of the main unit and KSES was broken, the pipes need to be repaired. |
Intake (582728.00 m В, 4420604.00 m С) Building (582135.00 m В, 4421694.00 m С) |
2 |
Tartar 4 |
Tartarchay |
12.8 |
36,8 |
350 |
1366 1523 |
157 |
138 |
11,14 |
No mains and pipes, the KSES building has been destroyed. |
Intake (586923.00 m В, 4434398.00 m С) Building (590605.00 m В, 4442561.00 m С) |
3 |
Lev-2 ( Kalbajar 4) |
Lev river |
1.7 |
5,0 |
350 |
1414 1468 |
54 |
48 |
4,31 |
No mains and pipes, the KSES building has been destroyed. |
Intake (595276.00 m В, 4456007.00 m С) Building (595272.00 m В, 4454215.00 m С) |
4 |
Kalbajar-2 |
Lev river |
0,9 |
2.5 |
350 |
1181,49 1152,61 |
28,88 |
19,88 |
5,2 |
A main unit and a pipe is available, the KSES building has been destroyed. |
X 601914.00 m E Y 4447667.00 m N |
5 |
Meydan 1 |
Maydan river |
2.9 |
8,6 |
350 |
1590 1939 |
349 |
307 |
1,17 |
The main unit, pipe and KSES building were destroyed. |
Intake (604212.00 m В, 4454567.00 m С) Building (608786.00 m В, 4456233.00 m С) |
Total : |
20.7 |
||||||||||
Lachin region |
|||||||||||
1 |
Hojaz |
Hojazsu river |
7.4 |
21,25 |
350 |
965 1086 |
121 |
106 |
8,36 |
The main unit and KSES building should be rebuilt. No pipe detected. |
X 627656.00 m E Y 4393868.00 m N |
2 |
Minkand |
Minkand road Zabukh river/ Aghoghlan river |
1.8 |
5.18 |
350 |
1550 1685 |
135 |
120 |
1,8 |
The main unit and KSES building were destroyed. The pipe must be repaired. |
X 608279.00 m E Y 4395069.00 m N |
3 |
Qalaja 1 |
Minkand road Zabukh river/ Aghoghlan river |
1.1 |
3,22 |
350 |
1422 1685 |
263 |
232 |
0,58 |
The main unit and KSES building were destroyed. The pipe is be repaired. |
X 610784.00 m E Y 4394731.00 m N |
4 |
Qalaja 2 |
Minkand road Zabukh river/ Aghoghlan river |
3.4 |
9,88 |
350 |
1390 1548 |
158 |
140 |
2,94 |
The main unit and KSES building were destroyed. Part of the pipe is present, the rest has been dismantled. |
X 610686.00 m E Y 4394692.00 m N |
5 |
Malibay |
Minkand road Zabukh river/ Aghoghlan river |
5.1 |
14,57 |
350 |
1010 1114 |
104 |
90 |
6,75 |
The main unit and KSES building were destroyed. No pipe detected. |
X 624824.00 m E Y 4386899.00 m N |
Total : |
18.8 |